Views:191
Applicants:4
Posted on 23 Sep, 2024
1) Review of fabrication, erection & shop drawings.
2) Review/ Prepare of QAP/ITP based on tender specification, drawing and Code of construction.
3) Site fabrication & erection inspection of steel structure, metal building as per Drawing and Structural Welding Code AWS D1.1
Min.5yrs in steel structure
Joining:ASAP